Use of Simulation Techniques in Determining the Fleet Requirements of an Open Pit Mine

Raymond Suglo, Sulemana Al-Hassan

Research output: Contribution to journalArticle

Abstract

When the final feasibility report on a new mine indicates that it is feasible under the prevailing technological and economic conditions to develop the project into an open pit mine, mine managers are often faced with the problem of determining the capacities, fleet sizes and how to match the materials handling equipment to ensure maximum production and profitability of the mine. One option is to use the results from other operating mines in similar geographic, geological and economic environments. Of late, most mine managements are increasingly depending on the results of computer simulations of their operations to determine the capacities, fleet sizes, for equipment matching. This paper uses the Visual SLAM with AweSim simulation software to determine the optimum fleet sizes of Kantaayele Goldfields Ltd., a gold mine in Ghana, which will enable the mine to meet its waste stripping and ore production targets. The use of simulation techniques as a tool in the modeling, formulation and testing of several models in the ore and waste mining operations of the mine are demonstrated. The results obtained from the simulation runs show that the mine cannot achieve its targets in ore mining and waste stripping with its initial fleets operating over 7.5-hour shifts per day. Using waiting times and queue lengths at the shovel and crusher locations as the determinants, the optimum fleet size for ore mining was found to be Option E with six 80-tonne trucks operating over 1350 minutes. For the waste stripping operations, the optimum fleet size was determined to be fourteen 80-tonne trucks.
Original languageEnglish
Pages (from-to)25-32
JournalGhana Mining Journal
DOIs
Publication statusPublished - 2009

Fingerprint

open pit mine
simulation
gold mine
economic conditions
profitability
computer simulation
software
ore
economics

Cite this

@article{d2af41f223814f5d9190cb490c4476ef,
title = "Use of Simulation Techniques in Determining the Fleet Requirements of an Open Pit Mine",
abstract = "When the final feasibility report on a new mine indicates that it is feasible under the prevailing technological and economic conditions to develop the project into an open pit mine, mine managers are often faced with the problem of determining the capacities, fleet sizes and how to match the materials handling equipment to ensure maximum production and profitability of the mine. One option is to use the results from other operating mines in similar geographic, geological and economic environments. Of late, most mine managements are increasingly depending on the results of computer simulations of their operations to determine the capacities, fleet sizes, for equipment matching. This paper uses the Visual SLAM with AweSim simulation software to determine the optimum fleet sizes of Kantaayele Goldfields Ltd., a gold mine in Ghana, which will enable the mine to meet its waste stripping and ore production targets. The use of simulation techniques as a tool in the modeling, formulation and testing of several models in the ore and waste mining operations of the mine are demonstrated. The results obtained from the simulation runs show that the mine cannot achieve its targets in ore mining and waste stripping with its initial fleets operating over 7.5-hour shifts per day. Using waiting times and queue lengths at the shovel and crusher locations as the determinants, the optimum fleet size for ore mining was found to be Option E with six 80-tonne trucks operating over 1350 minutes. For the waste stripping operations, the optimum fleet size was determined to be fourteen 80-tonne trucks.",
author = "Raymond Suglo and Sulemana Al-Hassan",
year = "2009",
doi = "10.4314/gm.v9i1.42606",
language = "English",
pages = "25--32",
journal = "Ghana Mining Journal",
issn = "0855-210X",

}

Use of Simulation Techniques in Determining the Fleet Requirements of an Open Pit Mine. / Suglo, Raymond; Al-Hassan, Sulemana.

In: Ghana Mining Journal, 2009, p. 25-32.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Use of Simulation Techniques in Determining the Fleet Requirements of an Open Pit Mine

AU - Suglo, Raymond

AU - Al-Hassan, Sulemana

PY - 2009

Y1 - 2009

N2 - When the final feasibility report on a new mine indicates that it is feasible under the prevailing technological and economic conditions to develop the project into an open pit mine, mine managers are often faced with the problem of determining the capacities, fleet sizes and how to match the materials handling equipment to ensure maximum production and profitability of the mine. One option is to use the results from other operating mines in similar geographic, geological and economic environments. Of late, most mine managements are increasingly depending on the results of computer simulations of their operations to determine the capacities, fleet sizes, for equipment matching. This paper uses the Visual SLAM with AweSim simulation software to determine the optimum fleet sizes of Kantaayele Goldfields Ltd., a gold mine in Ghana, which will enable the mine to meet its waste stripping and ore production targets. The use of simulation techniques as a tool in the modeling, formulation and testing of several models in the ore and waste mining operations of the mine are demonstrated. The results obtained from the simulation runs show that the mine cannot achieve its targets in ore mining and waste stripping with its initial fleets operating over 7.5-hour shifts per day. Using waiting times and queue lengths at the shovel and crusher locations as the determinants, the optimum fleet size for ore mining was found to be Option E with six 80-tonne trucks operating over 1350 minutes. For the waste stripping operations, the optimum fleet size was determined to be fourteen 80-tonne trucks.

AB - When the final feasibility report on a new mine indicates that it is feasible under the prevailing technological and economic conditions to develop the project into an open pit mine, mine managers are often faced with the problem of determining the capacities, fleet sizes and how to match the materials handling equipment to ensure maximum production and profitability of the mine. One option is to use the results from other operating mines in similar geographic, geological and economic environments. Of late, most mine managements are increasingly depending on the results of computer simulations of their operations to determine the capacities, fleet sizes, for equipment matching. This paper uses the Visual SLAM with AweSim simulation software to determine the optimum fleet sizes of Kantaayele Goldfields Ltd., a gold mine in Ghana, which will enable the mine to meet its waste stripping and ore production targets. The use of simulation techniques as a tool in the modeling, formulation and testing of several models in the ore and waste mining operations of the mine are demonstrated. The results obtained from the simulation runs show that the mine cannot achieve its targets in ore mining and waste stripping with its initial fleets operating over 7.5-hour shifts per day. Using waiting times and queue lengths at the shovel and crusher locations as the determinants, the optimum fleet size for ore mining was found to be Option E with six 80-tonne trucks operating over 1350 minutes. For the waste stripping operations, the optimum fleet size was determined to be fourteen 80-tonne trucks.

U2 - 10.4314/gm.v9i1.42606

DO - 10.4314/gm.v9i1.42606

M3 - Article

SP - 25

EP - 32

JO - Ghana Mining Journal

JF - Ghana Mining Journal

SN - 0855-210X

ER -