Load-bearing capacity of corroded, patched and FRP-repaired RC beams

Goitseone Malumbela, Pilate Moyo, Mark Alexander

Research output: Contribution to journalArticle

10 Citations (Scopus)

Abstract

This paper presents the results of an experimental study conducted to investigate the performance of corroded, patched and fibre reinforced polymer (FRP) repaired reinforced concrete (RC) beams. The overall programme tested 20 quasi-full-scale (153325433000 mm) RC beams of which 17 were corroded under various levels of sustained loads. After corrosion, eight beams were patch-repaired whilst four were FRP-repaired. Two of the patch-repaired beams were later further repaired with FRPs. The test results showed that 1% mass loss of steel reduced the load-bearing capacity of RC beams by 0.8%. Patch repairs were found to slightly increase (by 2.5%) the load-bearing capacity of corroded beams, but to significantly increase their stiffness. The load-bearing capacity of FRP-repaired beams was about 50% larger than the capacity of an uncorroded beam and was insensitive to levels of steel corrosion and to patch repairs. There was, however, a significant increase in stiffness of the patch- and then the FRP-repaired beams. It is, therefore, recommended that repair of corroded RC structures should entail patching followed by FRP repairs.

Original languageEnglish
Pages (from-to)797-812
Number of pages16
JournalMagazine of Concrete Research
Volume63
Issue number11
DOIs
Publication statusPublished - Nov 1 2011

Fingerprint

Bearing capacity
Reinforced concrete
Loads (forces)
Polymers
Repair
Fibers
Stiffness
Steel corrosion
Steel
Concrete construction
Corrosion

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering
  • Building and Construction
  • Materials Science(all)

Cite this

Malumbela, Goitseone ; Moyo, Pilate ; Alexander, Mark. / Load-bearing capacity of corroded, patched and FRP-repaired RC beams. In: Magazine of Concrete Research. 2011 ; Vol. 63, No. 11. pp. 797-812.
@article{6bc8d9327a3d4134bd3b05957926ac5d,
title = "Load-bearing capacity of corroded, patched and FRP-repaired RC beams",
abstract = "This paper presents the results of an experimental study conducted to investigate the performance of corroded, patched and fibre reinforced polymer (FRP) repaired reinforced concrete (RC) beams. The overall programme tested 20 quasi-full-scale (153325433000 mm) RC beams of which 17 were corroded under various levels of sustained loads. After corrosion, eight beams were patch-repaired whilst four were FRP-repaired. Two of the patch-repaired beams were later further repaired with FRPs. The test results showed that 1{\%} mass loss of steel reduced the load-bearing capacity of RC beams by 0.8{\%}. Patch repairs were found to slightly increase (by 2.5{\%}) the load-bearing capacity of corroded beams, but to significantly increase their stiffness. The load-bearing capacity of FRP-repaired beams was about 50{\%} larger than the capacity of an uncorroded beam and was insensitive to levels of steel corrosion and to patch repairs. There was, however, a significant increase in stiffness of the patch- and then the FRP-repaired beams. It is, therefore, recommended that repair of corroded RC structures should entail patching followed by FRP repairs.",
author = "Goitseone Malumbela and Pilate Moyo and Mark Alexander",
year = "2011",
month = "11",
day = "1",
doi = "10.1680/macr.2011.63.11.797",
language = "English",
volume = "63",
pages = "797--812",
journal = "Magazine of Concrete Research",
issn = "0024-9831",
publisher = "ICE Publishing Ltd.",
number = "11",

}

Load-bearing capacity of corroded, patched and FRP-repaired RC beams. / Malumbela, Goitseone; Moyo, Pilate; Alexander, Mark.

In: Magazine of Concrete Research, Vol. 63, No. 11, 01.11.2011, p. 797-812.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Load-bearing capacity of corroded, patched and FRP-repaired RC beams

AU - Malumbela, Goitseone

AU - Moyo, Pilate

AU - Alexander, Mark

PY - 2011/11/1

Y1 - 2011/11/1

N2 - This paper presents the results of an experimental study conducted to investigate the performance of corroded, patched and fibre reinforced polymer (FRP) repaired reinforced concrete (RC) beams. The overall programme tested 20 quasi-full-scale (153325433000 mm) RC beams of which 17 were corroded under various levels of sustained loads. After corrosion, eight beams were patch-repaired whilst four were FRP-repaired. Two of the patch-repaired beams were later further repaired with FRPs. The test results showed that 1% mass loss of steel reduced the load-bearing capacity of RC beams by 0.8%. Patch repairs were found to slightly increase (by 2.5%) the load-bearing capacity of corroded beams, but to significantly increase their stiffness. The load-bearing capacity of FRP-repaired beams was about 50% larger than the capacity of an uncorroded beam and was insensitive to levels of steel corrosion and to patch repairs. There was, however, a significant increase in stiffness of the patch- and then the FRP-repaired beams. It is, therefore, recommended that repair of corroded RC structures should entail patching followed by FRP repairs.

AB - This paper presents the results of an experimental study conducted to investigate the performance of corroded, patched and fibre reinforced polymer (FRP) repaired reinforced concrete (RC) beams. The overall programme tested 20 quasi-full-scale (153325433000 mm) RC beams of which 17 were corroded under various levels of sustained loads. After corrosion, eight beams were patch-repaired whilst four were FRP-repaired. Two of the patch-repaired beams were later further repaired with FRPs. The test results showed that 1% mass loss of steel reduced the load-bearing capacity of RC beams by 0.8%. Patch repairs were found to slightly increase (by 2.5%) the load-bearing capacity of corroded beams, but to significantly increase their stiffness. The load-bearing capacity of FRP-repaired beams was about 50% larger than the capacity of an uncorroded beam and was insensitive to levels of steel corrosion and to patch repairs. There was, however, a significant increase in stiffness of the patch- and then the FRP-repaired beams. It is, therefore, recommended that repair of corroded RC structures should entail patching followed by FRP repairs.

UR - http://www.scopus.com/inward/record.url?scp=84858184774&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84858184774&partnerID=8YFLogxK

U2 - 10.1680/macr.2011.63.11.797

DO - 10.1680/macr.2011.63.11.797

M3 - Article

AN - SCOPUS:84858184774

VL - 63

SP - 797

EP - 812

JO - Magazine of Concrete Research

JF - Magazine of Concrete Research

SN - 0024-9831

IS - 11

ER -